{ "snippet": "", "summary": "", "accessInformation": "DWR NRO", "thumbnail": "", "maxScale": "NaN", "typeKeywords": [], "description": "On December 2, 2012, DWR Northern Region Office staked the high-water event and measured the corresponding flow of Elder Creek through the SPFC project area near Gerber, CA. Flow measurement was done at San Benito Bridge. During the high-water event, the current water level was staked and the time of staking was noted. When possible, a stake was also placed at the estimated peak high-water location for the event based upon debris and other visible evidence.Note: High-water mark data are one of the best sources for calibrating hydraulic models; however, high-water mark data have inherent inaccuracies. Oftentimes, high-water marks are estimated from debris deposits. Debris deposits rarely form a nice, narrow, well defined line. Wind and wave action can cause debris to be washed higher than the actual water-surface elevation. High-water marks in overbank areas are often higher than they are in the channel.", "licenseInfo": "", "catalogPath": "", "title": "Elder_Creek_20121202", "type": "", "url": "", "tags": [], "culture": "en-US", "portalUrl": "", "name": "", "guid": "", "minScale": "NaN", "spatialReference": "" }