<?xml version="1.0" encoding="UTF-8"?><metadata xml:lang="en">
<Esri>
<CreaDate>20260605</CreaDate>
<CreaTime>12224800</CreaTime>
<ArcGISFormat>1.0</ArcGISFormat>
<SyncOnce>TRUE</SyncOnce>
</Esri>
<dataIdInfo>
<idCitation>
<resTitle>Elder_Creek_20121202</resTitle>
</idCitation>
<idAbs>On December 2, 2012, DWR Northern Region Office staked the high-water event and measured the corresponding flow of Elder Creek through the SPFC project area near Gerber, CA. Flow measurement was done at San Benito Bridge. During the high-water event, the current water level was staked and the time of staking was noted. When possible, a stake was also placed at the estimated peak high-water location for the event based upon debris and other visible evidence.Note: High-water mark data are one of the best sources for calibrating hydraulic models; however, high-water mark data have inherent inaccuracies. Oftentimes, high-water marks are estimated from debris deposits. Debris deposits rarely form a nice, narrow, well defined line. Wind and wave action can cause debris to be washed higher than the actual water-surface elevation. High-water marks in overbank areas are often higher than they are in the channel. </idAbs>
<idCredit>DWR NRO</idCredit>
</dataIdInfo>
</metadata>
